Joint sealing

Slicing of construction joints in industrial concrete floors should be made not later than 48 hours after the completion of concrete floor. The joints are filled with elastic material after the full completion of the floor to prevent edge demolition and protect the edges of the joints.

Polyurethane rope (Roc Ethafoam) should be placed in the joint and the top is filled with polyurethane PU 925.